tsukiwa Index du Forum

tsukiwa
Bienvenue chez Tsukiwa

 FAQFAQ   RechercherRechercher   MembresMembres   GroupesGroupes   S’enregistrerS’enregistrer 
 ProfilProfil   Se connecter pour vérifier ses messages privésSe connecter pour vérifier ses messages privés   ConnexionConnexion 

Tamrock Ranger 500 Pdf Download

 
Poster un nouveau sujet   Répondre au sujet    tsukiwa Index du Forum -> Membre -> Idée
Sujet précédent :: Sujet suivant  
Auteur Message
chrhend


Hors ligne

Inscrit le: 05 Mai 2016
Messages: 101
Localisation: Marseille

MessagePosté le: Dim 4 Sep - 01:13 (2016)    Sujet du message: Tamrock Ranger 500 Pdf Download Répondre en citant




Tamrock Ranger 500 Pdf Download > shorl.com/sahikuhukopi

























































bd40bc7c7a
Francis Haden, Blasting Manager for the JV, says that in his career of more than 15 years as a blasting specialist, he has never seen granite as tough as that which has to be broken up and removed from the WKT excavation. Key Specifications Recommended hole diameter 102 - 152 mm / 4"-6" Drill rod / tube diameter 51, 60, 87 mm / 2", 2 3/8", 3 " Hydraulic rock drill HL1560T, 33 kW (44 hp) RD1635CF, 35 kW (48 hp) as option Engine Caterpillar C11,261 kW (350 hp) / 1 800 rpm (Tier3) Caterpillar C13, 287 kW (385 hp) / 1 800 rpm (Tier4F) Flushing air capacity 14 m3/min, up to 10 bar (depends on rock tools) Operator cabin Ergo cool Certificate ROPS and FOPS Transport Length 11.5 m / 37.7 ft Transport Width 2.5 m / 8.2 ft Transport Height 3.2 m / 10.5 ft Weight 23 000 kg / 50 710 lbs . The JV had already decided on the use of Sandvik Ranger DX700 top-hammer drill rigs for the drill-and-split operation. Pantera DP1500i Drill rig. If there is a high risk of bench collapsing, you dont want to take that extra risk.

The JV is excavating 1.7 million m of earth, and placing 600,000 m of concrete and 150,000 tons of steel reinforcement. All the 14 rental units are new, and are being delivered from the factory in Finland. -. Hence the drill rigs reduce operating costs significantly due to their low fuel consumption rates that are achieved through a new advanced eco-package and engine RPM adjustment. However facing a combination of delaying factors, a review of the entire project during 2Q 2014 had concluded that combining the mechanical breaking of the rock with a drill and blast operation would lead to time-saving on the excavation. We dont receive our explosives until about mid-day, and we generally fire at 7 pm. The use of the radio controller is smooth and precise. The decision to use explosives was made in the middle of the year, with the first blast taking place on the 22nd September 2014.

google glass ieee pdf downloadtechnical analysis macd pdf downloadback to life chords pdf downloadexercicios de pg pdf downloaddownload placement papers of infosys pdfthe walking dead 125 pdf downloadreasoning questions in hindi pdf downloaddeterminacion de grasas pdf downloadcircular dichroism spectroscopy pdf downloadannexure i for tatkal passport pdf download


Revenir en haut
Publicité






MessagePosté le: Dim 4 Sep - 01:13 (2016)    Sujet du message: Publicité

PublicitéSupprimer les publicités ?
Revenir en haut
Montrer les messages depuis:   
Poster un nouveau sujet   Répondre au sujet    tsukiwa Index du Forum -> Membre -> Idée Toutes les heures sont au format GMT + 2 Heures
Page 1 sur 1

 
Sauter vers:  

Index | Panneau d’administration | Creer un forum | Forum gratuit d’entraide | Annuaire des forums gratuits | Signaler une violation | Conditions générales d'utilisation
Powered by phpBB © 2001, 2005 phpBB Group
Traduction par : phpBB-fr.com